Goodfellow Campus Bldg 103 Chiller Plant

General Services Administration (GSA) – St. Louis, Missouri

A 3,000 ton chiller plant to serve multiple data centers for GSA owned and operated building. The plant is fully redundant with 2n system configuration to maintain operations 24hr/7 day.  The system was installed to replace an n+2 chiller plant (total of 2,400 tons) and support additional loads with the data centers.  The project construction occurred with data centers remaining operational. Completion Date; 2013